Monday, September 28, 2009

Got pipes?

The next step was to paint a product called Dryloc on the outside walls and waterfall front where moisture might be an issue.
The inside gets a couple of coats of a high tech product that waterproofs the blocks by seeping into the pourous concrete and creating a flexible waterproof membrane that I can tile over.
But first it was time to cut some pvc and dry fit the plumbing for the various functions of the spa.
Everything went according to the plan I made. I'm missing some fittings that I had to order online, but generally it went pretty well. It is amazing how many feet of pipe are going into this hole. I'll do the calculations and get back to you!


2 comments:

  1. Your prowess continues to impress me. Keep up the good work.

    ReplyDelete
  2. Gorgeous tiling pattern. Such patience! Amazing and impressive.

    ReplyDelete

Followers