The fourth row has rebar in it according to the plans that call for horizontal steel every 16". I also had to ground the equipment to this level of rebar, as well as a ground to the steel pole that supports the avocado tree that is within 5' of the spa.
Five more spa jet housings went into this row the same way as the fourth row, plus the rebar.
I put in the top blocks for the steps, which made it easier to get in and out of the spa. I had to fill these blocks with mortar before I placed them. I don't know how much they weighed, but I was glad to finish them.
I filled the 114 cells in the seating area and outside walls before I gave the seating area a flat top coat that challenged my concrete finishing ability.